RPO
National Technical Workgroup Meeting
Theme:
Integration
(To download an agenda,
click on the icon.)
|
Original Agenda
(Revised |
Agenda Revisions Made at
Meeting |
|||
|
DAY 1 B |
||||
|
12 B 1 |
Training room available for VIEWS/CATT Hands-On Training (PCs
and trainers also available during the course of the meeting) Director=s Row 46, 4th Floor |
|
|
|
|
1 B |
PLENARY SESSION |
Promenade
Ballroom D, 2nd Floor |
|
|
|
|
Welcome and
Logistics |
RPO Directors and Bill Beal |
|
|
|
|
Goals of the Meeting |
Discussion Group Leaders |
|
|
|
|
VIEWS & CATTS training announcement |
McClure/Husar (10 minutes) |
|
|
|
|
Discussion Groups Meeting (based on the following agenda): |
|
|
|
|
MONITORING and DATA ANALYSIS |
4th Floor |
|
|
|
|
|
Welcome &
agenda overview Introductions (around the room) |
Pitchford & Poirot |
|
|
|
|
RPO
data/monitoring overviews (15 min/RPO) |
Each RPO Rep. |
RPO Data/monitoring overviews (15 min/RPO) |
Rich Poirot Ray Bishop |
|
|
|
Jay Turner |
|
|
|
|
Midwest RPO ion study |
Donna Kenski |
**Presentation part of MRPO update |
|
|
|
|
Jeff Collett |
|
|
|
EMISSION INVENTORY |
4th Floor |
|
|
|
|
|
Welcome and Agenda Overview |
|
|
|
|
|
Introductions |
|
|
|
|
|
RPO Discussion/Consensus Session B |
Moderators: Laura Boothe and Tom Moore |
|
|
|
|
8-9 projects, each for 25-30-minute in-depth
presentations/discussion |
|
|
|
|
|
$
WRAP
Windblown Dust Model development project $
WRAP
Ammonia EI Improvement project $
WRAP
Point/Area Chemical Speciation/Temporal Allocation Profile Improvement
project $
MWRPO
CEM/EGU analysis $
MWRPO
NH3 Temporal Work/Ammonia Model Project $
MWRPO
Nonroad Project (vessels, motorboats, ag, const, Rrs) $
MWRPO
Area Source EI Methods Comparison project $
MWRPO
IPM Review project $
VISTAS
states 2002 inventory compared to 99 NEI |
|
$
WRAP Point/Area
Chemistry/Temporal Profiles QA $
EPA Commitment
to reformat CEM/EGU data $
MWRPO
Area Source EI Methods |
Ralph Morris Tom Pace Tom Moore Mark Janssen Marc Houyoux Mark Janssen Mark Janssen Pat Brewer Megan Schuster |
|
Photochemical and Meteorological
MODELING |
|
|
|
|
|
|
|
|
Calvin Ku |
|
|
|
MANE-VU Update |
|
|
|
|
|
|
|
Kirk Baker |
|
|
|
|
|
Sheila Holman |
|
|
|
|
|
John Vimont |
|
|
|
|
|
|
|
|
|
|
Brian Timin |
|
|
|
|
RPO Grant Guidance Review |
Rosalina Rodriguez |
|
|
|
|
|
|
|
|
|
PLENARY SESSION |
Promenade D, 2nd Floor |
|
|
|
|
|
Session on PM Forecasting
hosted by Monitoring & Data Analysis Group and open to all |
Jim Szykman |
|
|
|
|
ADJOURN |
|
|
|
|
|
Training room available for VIEWS/CATT
Hands-on Training |
Director=s Row 46, 4th Floor |
|
|
|
DAY 2 B |
||||
|
|
Training room available for VIEWS/CATT
Hands-On Training |
Director=s Row 46, 4th
Floor |
|
|
|
|
|
|
||
|
MONITORING and DATA ANALYSIS |
4th
Floor |
|
|
|
|
|
|
Mark Green |
Dave DuBois |
|
|
|
|
Eric Edgerton |
|
|
|
|
|
George Allen |
|
|
|
|
|
Kevin Crist |
Kevin Crist and Charlie Crawford |
|
|
|
|
Shawn McClure |
|
|
|
|
Group Discussion B Opportunities for Coordination |
Rich Poirot |
Postponed until 11/6 |
|
|
EMISSION INVENTORY |
|
|
|
|
|
Status Report on 2002 National Wildfire
EI Projects |
Pete Lahm, USFS & WRAP |
|
David Misenheimer |
|
|
General fire EI discussion |
Pete Lahm, USFS & WRAP |
|
Stefan Falke |
|
|
|
Mark Janssen, |
|
Mark Janssen/Tom Moore |
|
|
VISTAS Fire Emissions Project |
Greg Stella, VISTAS |
|
Greg Stella |
|
|
EPA Fire Emissions Work |
Tom Pace, OAQPS |
|
Marc Houyoux Tom Pace |
|
|
Questions for EPA: Haze SIP EI
Requirements and Discussion |
Tom Moore, WRAP |
Fire Emissions Projects |
|
|
|
|
$
Coordination
of consistent EI methods with EPA regions across RPO regions $
Clear
Guidance on the use of Transport fractions $
Clear
Guidance on reconciliation of modeling versus SIP inventories $
Specific
list of area/nonroad categories to include $
Finalization
of new Motor Vehicle NH3 emission factor $
Requirement
for use of CEM versus State EGU inventory |
|
$
EPA
Fire |
Mark Janssen Pat Brewer Tom Pace Stefan Falke |
|
EPA briefing on: |
Phil Lorang |
|
|
|
|
|
$
How
the 2001 CERR is incorporated into 2002 NEI $
How
the 2002 Ainterim@ NEI will be grown from the 1999 NEI $
How
state data will incorporate state/tribal data splits into 2002 NEI |
|
|
|
|
Photochemical and Meteorological
MODELING |
|
Changed
location to St. Louis Ballroom E, 4th Floor |
|
|
|
|
|
Kirk Baker |
|
|
|
|
|
CENRAP |
Betty Pun |
|
|
|
|
John Vimont |
|
|
|
|
|
Jim Boylan |
|
|
|
|
Recent WRAP Modeling |
WRAP |
|
|
|
|
Application of CMAQ to assess
particulate matter using two chemistry modules |
Gopal Sistla |
Cancelled |
|
|
|
LUNCH and training room available for
VIEWS/CATTS Hands-On Training |
Director=s Row 46, 4th Floor |
|
|
|
|
PLENARY SESSION |
|
|
|
|
|
Update on Natural Background Guidance |
Neil Frank |
Guidance
for Estimating Natural Visibility Conditions Under the Regional Haze Rule |
|
|
|
|
Dan Jacob |
|
|
|
|
|
Doug Solomon |
Fred Dimmick |
|
|
15 min. |
BREAK |
|
|
|
|
|
Discussion Groups Meeting (based on the
following agenda): |
|
|
|
|
MONITORING and DATA ANALYSIS |
|
|
|
|
|
|
|
Doug Lowenthal |
|
|
|
|
|
Dennis Crumpler |
|
|
|
|
|
George Allen |
|
|
|
|
|
Tom Moore |
|
|
|
|
Updates on new multi-RPO initiatives
(Natural Haze Sensitivity Assessment, CATT, FASTNET) |
Poirot/Pitchford |
Included in Husar discussion |
|
|
|
|
Rudy Husar |
|
|
|
EMISSION INVENTORY & MODELING (Joint Session) Timelines for Inventory Development OPEM, Ammonia Model Emissions sensitivity related modeled
runs |
4th Floor |
JOINT SESSION $
OPEM $
Ammonia and WB Dust EI
projects $
Projections
of Visibility Improvement and modeling sensitivity analysis Discussion Items $
Inter-RPO
timing, coordination, and deliverables $
Use
of Dust Transport Fractions |
Mark Janssen Ralph Morris Marc Houyoux |
|
|
|
|
|
EMISSION INVENTORY Fire Emissions Projects $
National
Wildfire EI |
Pete Lahm |
|
|
ADJOURN |
|
|
|
|
DAY 3 B |
||||
|
|
Training room available for VIEWS/CATT
Hands-On Training |
Director=s Row 46 |
|
|
|
|
Discussion Groups Meeting (based on the
following agendas): |
|
|
|
|
MONITORING and DATA ANALYSIS |
4th Floor |
|
|
|
|
|
Discussion
of Monitoring & Data Analysis & Schedules in RPO Grant Guidance |
Pitchford & Rodriguez |
|
|
|
|
Discussion of opportunities for
integration of RPO Data Analysis Activities (VIEWS, CATT, FASTNET, Modeling,
etc) |
Poirot and all |
|
|
|
|
Updates from EI & Modeling Groups |
TBA |
Cancelled |
|
|
|
Discussion for Opportunities for
Coordinating Integration of Future RPO/EPA/IMPROVE Monitoring Activities |
Collett/Allen/All |
|
|
|
|
Discussion of next years workgroup
process, co-chairs, etc., and any unfinished business |
Poirot/Pitchford/All |
|
|
|
EMISSION INVENTORY |
|
|
|
|
|
Ideas for tracking and registry of
inventories B Methods to exchange the data and maintain
version control of inventories, including prospective schedule for keeping in
touch as EIs are revised B Tom Moore and Mark Janssen (Combined schedule of major EI
milestones for each RPO B Tom drafting. Review of
minimum quality assurance needs and website formats for emissions data
exchange B Mark drafting.) |
|
$
Electric
Utility Growth Methodology Review $
Building a
Better Ammonia NEI $
Revision of
the NEI of Ammonia from Animal Husbandry $
Emission
Modeling Survey Results $
AGrill Phil@
Questions for EPA $
Closeout |
Mark Janssen Mark Janssen Marc Houyoux Marc Houyoux All Tom Moore |
|
|
EPA Projection Issues B Pat Brewer B open discussion, brainstorming |
|
|
|
|
|
Emissions Closeout Session B Laura and Tom - Discussion of
cooperative projects/combining resources, review remaining issues, selection
of next year=s workgroup co-chairs |
|
|
|
|
|
MODELING |
Plans for next year |
|
|
|
|
|
Selection of next years co-chairs |
|
|
|
|
|
|
|
Mike Abraczinskas |
|
|
|
Meteorological Modeling Issues
Discussion |
|
Kirk Baker Mike Abraczinskas |
|
|
|
Discuss goals for group for the next
year |
|
|
|
|
|
Ideas for the next national RPO
technical meeting |
|
|
|
|
|
ADJOURN |
|
|
|